Projects

Water Resources Coordination Division, National Environment Commission of Bhutan

Assignment

Consultancy For Conducting Analysis Of Water Source Survey Data And Hydrological Analysis Of Water Availability Projections Under Different Climate Scenarios In Samtse, Tsirang, PemaGatshel And Mongar.
Contact : TshewangLhamo (Ms.), Project Manager, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Coordination of activities for the assignment, review, edit and compilation of the analysis, hydrological analysis and GIS mapping.

National Adaptation Programme of Action (NAPA II), Environment and Livelihoods Portfolio, UNDP, BHUTAN

Assignment

“External evaluation of the hydro-met network and developing a long-term sustainability strategy for National Center for Hydrology and Meteorology (NCHM)”, NAPA II Project.
Contact : Netra Sharma(Mr.), Project Support Officer, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Review of the NAPA II Project components at NCHM, Coordination of Field visits and assessment, preparation of a strategic document for NCHM, Bhutan.

Climate Change Division, National Environment Commission and UNEP

Assignment

Preparation of the National Environmental Data Needs Assessment Report.
Contact : TsheringTashi, Communications Officer, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Stakeholder Consultation of all environmental agencies in Bhutan, compilation of environment data needs as per the national plans, SDGs, MEAs, FDES and linking them to the State of the Environment Report. Preparation of the national report and its submission to UNEP, Bangkok.

Department of Roads, MOWHS- Asian Development Bank, Gyaltshen Consultancy - EGIS International, Sub-consultant

Assignment

Phuentsholing – Chamkuna Road Project, as part of ADB G0400-BHU & ADB L3149: Design Service for SASEC Road Connectivity Project.
Contact : Shanti Katel, Deputy Team Leader, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Hydrological Analysis, determination of Climate risks and flooding issues of the outfall, HEC RAS Hydraulic modeling of the watersheds, and determination of various engineering solutions for the highway including hydraulic structures such as culverts and bridges.

UNDP Bhutan and Phuentsholing Thromde, Gyaltshen Consultancy, sub-consultant

Assignment

Hydrological Modelling of Omchhu Including Engineering Solutions, Detailed Design and Drawings of Mitigation Structures with Land Scape Design.
Contact : Mr. Lhendup Dorji, Project Manager, NAPA-II Project, Phuentsholing Thromde, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Assessment of social and environmental impact of the project, hydrological and hydraulic modelling, overall project coordination as Dy. Team Leader.

World Bank and Department of Hydropower and Power Systems, MOEA, SWECO and Phuensum Consultancy, sub-consultant

Assignment

Cumulative Impact Assessment of Kuri - Gongri Basin under Hydropower Development

Relevant Responsibilities

Analysis of Hydrology and Climate Data of the Manas Basin (5 major rivers); Review of Flood issues, and analysis of hydro- meteorology and sedimentation issues of the basin; Water quality data collection and analysis for CIA; Compilation and Analysis of Sedimentation issues in the basin; Provision of data and view on hydropower development from hydrology and water resources, and sedimentation issues in the basin.

Department of Engineering Services, MOWHS

Assignment

Improved Urban Environmental Infrastructure Project for ADB-Bhutan.
Contact; KapilPradhan, Deputy Team Leader, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Environment Impact Assessment of the 8 urban centers for urban development projects. Projects include Water Supply, Sanitation, and Flood Mitigation. Preparation of IEE as per ADB Environment Safeguards Policy for the 8 sub-projects.

Jigme Mining Corporation, Thimphu

Assignment

Environmental and Social Impact Assessment of Jadolum Limestone Mine, Paro.
Contact : AshishChhetri, Managing Director, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

EIA; Social and Environment Assessment of the Limestone Mine, along with preparation of EMP and Mitigation Plans. Clearance under process.

National Environment Commission – ESD. Sub-Consultant to E.C.O and its consortium, Austria

Assignment

Environmental Flow for Hydropower Project.
Contact : TsheringChoden, Project Manager, ESD, NECS, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Hydrological Field Data Collection and Analysis, Hydrological Analysis and development of Environmental Flow Guideline for Bhutan.

Bhutan Water Partnership, Royal Society for Protection of Nature. Contact; KingaWangdi, Country Coordinator, BhWP, RSPN. This email address is being protected from spambots. You need JavaScript enabled to view it.

Assignment

Consultancy Services for Survey, Assessment and compilation of traditional knowledge and practice for water resource management in Bhutan.

Relevant Responsibilities

Field Survey of water bodies and uses, report preparation. Ten cases were surveyed and reviewed.

UNDP, Bhutan ; Sub-Consultant to Andreas Karner, Contact; Nar Bdr. Programme Analyst, This email address is being protected from spambots. You need JavaScript enabled to view it.

Assignment

TERMINAL EVALUATION OF SUSTAINABLE RURALBIOMASS ENERGY PROJECT (SRBE)

Relevant Responsibilities

Planning and executing stakeholder analysis, field data collection, analysis of environmental and Social benefits, and presentations from 5 districts across Bhutan.

AIT- Asian Institute of Technology, Bangkok, Thailand

Assignment

NewTAP Project to Network to Water Technology in Asia Pacific.
Contact : Prof. C. Visvanathan, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Data collection of Water Treatment Plants, Analysis and Report Preparation. Three Water Treatment Plants in three locations.

Druk Green Power Corporation – Sub-consultant to RC Consultancy, Thimphu

Assignment

NyeraAmari I&II Integrated Hydropower Project,
Contact : Tandintshering, Project Manager, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Input to the Environment and Social Impact Assessment (ESIA) Project. Hydrological data collection, Hydrological Analysis and Hydraulic Modelling in HEC RAS.

Department of Engineering Services- Water and Sanitation Division, Ministry of Works and Human Settlement; Sub-Consultant to Progressive Research and Consulting Services, Thimphu

Assignment

Preparation of Water Supply and Sewerage Masterplan for Paro Valley.
Contact : TsheringChhoden, Executive Engineer, DES, MoWHS, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Hydrological data collection, Hydrological analysis, Modelling and climate change analysis and determination of water availability. Climate Change and Watershed Assessment.

Department of Engineering Services- Water and Sanitation Division, Ministry of Works and Human Settlement; Sub-Consultant to Progressive Research and Consulting Services, Thimphu

Assignment

Preparation of Water Supply Masterplan for Bumthang.
Contact;TsheringChhoden, Executive Engineer, DES, MoWHS, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Hydrological data collection, Hydrological analysis, Hydrological Modelling, climate change analysis and determination of water availability. Climate Change and Watershed Assessment.

Department of Human Settlement – Ministry of Works and Human Settlement; Sub-Consultant to United Consultancy, Thimphu

Assignment

Preparation of Paro Valley Development Plan.
Contact: SonamTshering, Director, UC, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Review and collection of environmental data such as water supply, sanitation, flood assessment, climate change and solid waste. Proposal of maseterplan for the valley based on field data, stakeholder consultants and analysis.

UgyenWangchuck Institute for Conservation and Environment Research, Bumthang, Bhutan

Assignment

Asia High Mountain Project, WWF Bhutan,
Contact : KinleyChoden, Research Officer, This email address is being protected from spambots. You need JavaScript enabled to view it.

Relevant Responsibilities

Planning and Implementation of Training on “Hydrological and Meteorological Data Collection, Analysis and Management.”

National Environment Commission. Contact; TsheringChoden, Project Manager, ESD, NECS. This email address is being protected from spambots. You need JavaScript enabled to view it.

Assignment

Provided Training on “Hydrology, Hydraulics and Hydrological and Hydraulic Models” Jan 2016.

Relevant Responsibilities

Planned, and implemented the training as the resource person.
© 2017 ChhimiD Consulting | All rights Reserved.